Projects

Government Projects

Mount Pleasant, Primary School

Location: Victoria

Duration: 4 days

Asbestos removal of mastic behind brickwork and Ac sheeting

Scope:

Remove mastic from brick walls

Asbestos removal of Ac sheeting from canopies/eaves

Young Street, Frankston

Location: Victoria

Duration: 1 week

Asbestos removal of Ac sheeting from canopies.

Scope:

Asbestos closer around building to protect the public

Traffic management

Asbestos removal of Ac sheeting from canopies

Niddrie Primary School

Location: Victoria

Duration: 2 weeks

Asbestos removal of Ac sheeting and Mastic from brick walls.

Scope:

Asbestos removal of Ac sheeting

Remove Mastic from brick walls

clean-up of Ac sheeting from under neath of the building and soil

Mount Alexander College

Location: Victoria

Duration: 2 weeks

Friable asbestos removal Male and Female toilets (Ground Floor – Level 1 – Level 2)

Scope:

Friable Asbestos removal Male and Femail Toilets

Removed all contaminated soil.

Ramsay Clinic – Albert Road

Location: Victoria

Duration: 3 weeks

Friable Asbestos removal asbestos glue (Blackjack)

Scope:

Set up mini enclosures to sand blast asbestos glue (Blackjack) from 4 different areas on Level 3

Fawkner Leisure Centre

Location: Victoria

Duration: 3 weeks

Asbestos removal of Ac sheeting and Pipe work around pools

Scope:

Removal of asbestos pipes and Ac sheeting around pools during demolition

Watsonia Primary School

Location: Victoria

Duration: 3 months

Asbestos removal of class room buildings, followed by remediation of soil to get ready for construction re build

Scope:

Remove AC sheeting, vinyl tiles and duct work

Removed all contaminated soil

Scotch College – Morrison Street Hawthorn – (McMeckan School House)

Location: Victoria

Duration: 12 months

Asbestos removal of existing boarding school building to make the site ready for demotion/refurbishment and other upgrades

Scope:

  • Removal of Friable asbestos from beams in accommodation areas including roof
  • Removal of asbestos vinyl floors, Ac sheet and duct work for demolition works
  • Clean up of asbestos contaminated dust between wall cavities

Industrial Projects

Coburg North

Location: Victoria

Duration: 1 week

Remediation of Methamphetamine Contamination to entire warehouse

Scope:

Decomtainted steel roof, brick walls and concrete floors

217 – 219 Nelson PI, Williamstown

Location: Victoria

Duration: 1 week

Insurance work, clean up of all fire damage materials

Scope:

Removal of all materials damaged during fire contaminated with asbestos

Tic Group

Building 2, 207 Sunshine Rd Tottenham

Location: Victoria

Duration: 3 months

  • Removal of contaminated materials due to fire and water damage
  • Asbestos removal of Tic warehouse after fire and water damage. Built and enclosure so remaining factory can still operate safely.

Scope:

  • Ac roof removal and contaminated dust
  • Clean up of asbestos contaminated dust in warehouse