Location: Victoria
Duration: 4 days
Asbestos removal of mastic behind brickwork and Ac sheeting
Scope:
Remove mastic from brick walls
Asbestos removal of Ac sheeting from canopies/eaves
Location: Victoria
Duration: 1 week
Asbestos removal of Ac sheeting from canopies.
Scope:
Asbestos closer around building to protect the public
Traffic management
Asbestos removal of Ac sheeting from canopies
Location: Victoria
Duration: 2 weeks
Asbestos removal of Ac sheeting and Mastic from brick walls.
Scope:
Asbestos removal of Ac sheeting
Remove Mastic from brick walls
clean-up of Ac sheeting from under neath of the building and soil
Location: Victoria
Duration: 2 weeks
Friable asbestos removal Male and Female toilets (Ground Floor – Level 1 – Level 2)
Scope:
Friable Asbestos removal Male and Femail Toilets
Removed all contaminated soil.
Location: Victoria
Duration: 3 weeks
Friable Asbestos removal asbestos glue (Blackjack)
Scope:
Set up mini enclosures to sand blast asbestos glue (Blackjack) from 4 different areas on Level 3